Project Stages

Application & Verification

Application & Verification

In House Application Teams

Aithon SFS provide a ‘concept to completion’ service. All Aithon SFS projects are completed by in-house application teams who are specifically trained in applying intumescent coatings to concrete structures.

Sample drilling

Verification

Aithon SFS, in compliance with the Golden Thread principle enshrined in the Building Safety Act, utilises a third party Fire Engineer to verify each stage of the project from design to application.

This independent verification validates the products use, paint loadings calculations, substrate suitability and coating application. Upon completion of a project, the verifying Fire Engineer will provide a project specific Structural Report ( According to BS EN 1992-1-2) which confirms the fire resistance upgrade to the structure.

Inspecting Coating
Inspecting Coating

Warranty

All verified Aithon SFS projects can provide a project specific full warranty on both the design and application.

Structural assessment icon

Structural
Assessment

Thermo Modelling Icon

Substrate
Suitability

Thermo Modelling Icon

Thermo
Modelling

Application verification icon

Application &
Verification