News

SFS upgrade Liverpool Tower block for hotel development

SFS upgrade Liverpool Tower block for hotel development

SFS have been appointed to upgrade the seventeen storey Tower development in Liverpool. The soffit of all the floors of the tower required to be upgraded to R120. The two-way spanning soffit had a low inherent fire resistance but SFS was appointed to upgrade the Tower block soffits with the paint system. Cost and speed of application were the determining factors in selecting SFS.

Liverpool Tower block